Many Porto properties have barrel-vault cellars converted to habitable use without adequate waterproofing. Negative-side slurry tanking addresses lateral Douro pressure where injection alone fails.

Local masonry challenge in Porto
Ribeira and Miragaia cellars sit below the water table for months each winter. Owners who inject walls without addressing floor-to-wall joints see rework within two seasons.
Landmarks and neighbourhoods we cover
Douro riverfront warehouses, São Bento station granite blocks, Clérigos tower vicinity
- Ribeira wine lodges
- Miragaia vaulted cellars
- Campanhã hillside basements
What we deliver on site
- Hydrostatic pressure assessment
- Substrate preparation — raking out failed bitumen or cement
- Cementitious slurry (2–3 coats) or membrane specification
- Cavity drain membrane where continuous positive-side access exists
- Sump and pump sizing for habitable conversions
Typical timeline: Tanking programme: 2–4 weeks depending on vault geometry and cure times.
Local FAQ
Internal slurry systems are reversible — we document all interventions for future conservation audits.
We assess lateral moisture from adjacent wine cellars separately from groundwater rise.